Today the guys got almost all of one side on the addition sided:
and up to the windows on the front:
before it started storming and the contractor ordered them off of the roof!
Inside, the last bit of insulating was completed, and it was all vapor blocked:
The upstairs is full of sheetrock, in preparation for drywalling tomorrow. The inspector comes at 11:30 to inspect the insulation before the drywall can begin!
I think I forgot to post that we ordered the carpet, too. It's Beaulieu Puresque carpet in Marion Oaks (the mid-pile) in the color charcoal (a medium gray). We may end up getting carpet all the way down the stairs as they've gotten pretty beaten-up in the remodel.