A day full of plumbing! Here's the hot and cold water pipes heading upstairs:
And passing through my first-floor linen closet, next to the drain that was run yesterday:
And coming up through the floor, also near the drain:
continuing over... this also shows the drain running to the shower:
And here's where the vanity will be:
Tomorrow afternoon the inspector comes (the plumber will finish in the morning) and the lumber is being delivered. They'll start framing in the bathroom tomorrow. The dumpster will be delivered on Monday and demolition begins then (if it's not raining!).
Subscribe to:
Post Comments (Atom)
1 comment:
our plumber uses those red/blue pipes too. aren't they cool how they can bend?
who is doing the work?
Post a Comment